ARTICLE IN DRAGØR NEWS 25 DECEMBER 2025
Renovation and modernization of Dragør Badehotel expected by spring 2027 at the latest
The new Dragør Badehotel will open at the beginning of 2027 with a completely new modernized look . The old main building from 1907 will be preserved, but renovated from the inside and out. In addition, two wooden extensions will be added, designed to fit both the original design of the beach hotel and the surroundings. The project was designed by Danielsen Architecture.
- The hotel will contain a total of 61 rooms, two restaurants totaling 215 square meters, a conference center of 260 square meters and a spa area.
- The ground floor will house the reception, lounge, restaurant, production kitchen, conference center and a number of rooms with their own terrace.
- There will be rooms on the first and second floors.
More than 80 million kroner has been allocated for the project.